Первый этап был введен в строй в период с 1958 по 1960 год; было введено в действие восемь паровых котлов K 125, четыре турбины 50 МВт и одна турбина 12 МВт.
The first part of the power station came into operation between 1958 and 1960, and consisted of eight K 125 steam boilers, four 50 MW turbines, and one 12 MW turbine.